Place-Based Education Evaluation Collaborative
PEEC Home Page | Research | Tools | Resources | Reports | Forum | Subscribe | Search
Project CO-SEED Evaluation Reports --- ALL REPORTS, ALL YEARS

Below are links to and very brief descriptions of all CO-SEED evaluation reports, in order by date completed.





Vinalhaven 2008 Evaluation Report (Exec Sum, PDF)
        Integrated, summative report of three years of CO-SEED in Vinalhaven, ME.

Warren 2008 Evaluation Report (Exec Sum, PDF, Exemplars)
        Integrated, summative report of three years of CO-SEED at Warren Community School in Warren, ME.

2006 Cross-Site Eval (Exec Sum, PDF) Note: large pdf takes a few minutes to download)
Includes research portraits describing implementation at each of the four sites that concluded three years of formal CO-SEED tenure in 2006. Also includes cross-site reflections on the CO-SEED Logic Model.

Strength In Numbers, Boston 5-22-07 (PPT, PDF) Note: large ppt, takes a few minutes to download)
PowerPoint presentation summarizing CO-SEED findings across twelve sites spanning eight years and four states. Special emphasis on quantitative findings and future recommendations for research.

Haley Quantitative Summary 2007 (Exec Sum, PDF)
Informal supplemental report summarizing standardized test score analysis and other academic achievement measures at the Haley Elementary in Roslindale, MA (near Boston).

Eval Brief, Haley Academic Achievement, June 2007 ( PDF)
One page summary of selected results from test score analysis.

Dearborn Portrait 2003-2006 (Exec Sum, PDF)
Integrated, summative description of three years of CO-SEED at Dearborn Middle School in Roxbury, MA (near Boston).

YA Portrait 2003-2006 (Exec Sum, PDF)
Integrated, summative description of three years of CO-SEED at Young Achievers Science and Mathematics Pilot School in Jamaica Plain, MA (near Boston).

Haley Portrait 2003-2006 (Exec Sum, PDF)
Integrated, summative description of three years of CO-SEED at Haley Elementary in Roslindale, MA (near Boston).

05-06 Gorham Quantitative Evaluation Report (Exec Sum, PDF)
Supplemental report summarizing standardized test score analysis at the CO-SEED site in Gorham, NH.

Eval Brief, Gorham Test Scores 1998-2004 (PDF)
One page summary of selected results from test score analysis.

05-06 Beebe Quantitative Evaluation Report (Exec Sum, PDF)
Supplemental report summarizing standardized test score analysis at the CO-SEED site in Malden, MA.

Eval Brief, Beebe Test Scores 2000-2005 (PDF)
One page summary of selected results from test score analysis.

Bradford Portrait 2003-2005 (Exec Sum, PDF)
Integrated, summative description of three years of CO-SEED at Bradford Elementary in VT.

03-04 Final CO-SEED Eval (Exec Sum, PDF)
Description of on-going CO-SEED implementation at eight sites. Also includes extensive survey data and literature review.

03-04 Dearborn Survey Report (Intro, PDF)
Supplemental report presenting descriptive statistical results of first year surveys at Dearbon Middle School.

03-04 Young Achievers Survey Report (Intro, PDF)
Supplemental report presenting descriptive statistical results of first year surveys at Young Achievers School.

03-04 Haley Survey Report (Intro, PDF)
Supplemental report presenting descriptive statistical results of first year surveys at Dearbon Middle School.

02-03 Evaluation Report (Exec Sum, PDF)
Integrated qualitative analysis of CO-SEED implementation at five sites.




The following reports were prepared by evaluators other than PEER Associates, Inc.

01-02 Evaluation, Qualitative (PDF)
Prepared by RMC Research Corporation.

01-02 Evaluation, Quantitative (PDF)
Prepared by RMC Research Corporation.

00-01 Evaluation (PDF)
Prepared by Carla Fontaine.

99-00 Evaluation (PDF)
Prepared by Carla Fontaine.




Last Updated: Friday, Jul 10, 2009


PEEC Home Page | Research | Tools | Resources | Reports | Forum | Search